Project
ZABAL Gamez
| State | LIVE, UNFINISHED |
| Live | zabalgamez.com |
| Repo | ZAODEVZ/zabalgames, imanafrikah-base-eth/zabal-cli |
| Started | 24 Jul 2026 (first IMan commit) |
| Last touched | 14 Sept (nightly backup) |
| Due | none recorded |
Done
- 27 Jul: Week 5 newsletter catch-up drafted.
- 8 to 9 Aug: LoopHouse CLI (zabal-cli) Week 1 MVP. Reads git history, writes a hackathon submission. 11 tests pass.
- 3 Sept: Season 1 recap written with the newsletter voice guide.
- Nightly KV backup runs every day.
Left to finish
- Eight open issues from 3 to 4 Jul: scoring TBDs, WaveWarZ-Base ship date, Search Console, build-days, recording links, collectibles checkout.
- zabal-cli weeks 2 onward (scope comes from the Loops House co-pilot).